Skip to main content

IMSProjectTemplate

SubTemplate for IMSProject. Part of a IMSTemplate. Defines templated fields with specific types (defined using JSON schema).

type IMSProjectTemplate implements BaseNode, BaseTemplate, Named, NamedNode, Node, SubTemplate {
description: String!
hasPermission(
permission: AllPermissionEntry
): Boolean!
id: ID!
name: String!
partOf: IMSTemplate!
templateFieldSpecifications(
namePrefix: String
): [JSONField!]!
usedIn(
after: String
before: String
filter: IMSProjectFilterInput
first: Int
last: Int
orderBy: [IMSProjectOrder!]
skip: Int
): IMSProjectConnection!
}

Fields​

IMSProjectTemplate.description ● String! non-null scalar​

The description of this entity.

IMSProjectTemplate.hasPermission ● Boolean! non-null scalar​

Checks if the current user has a specific permission on this Node

IMSProjectTemplate.hasPermission.permission ● AllPermissionEntry enum​

The permission to check for

IMSProjectTemplate.id ● ID! non-null scalar​

The unique id of this node

IMSProjectTemplate.name ● String! non-null scalar​

The name of this entity.

IMSProjectTemplate.partOf ● IMSTemplate! non-null object​

The Template this SubTemplate is part of

IMSProjectTemplate.templateFieldSpecifications ● [JSONField!]! non-null object​

All template field specifications, if a namePrefix is provided, only those matching it

IMSProjectTemplate.templateFieldSpecifications.namePrefix ● String scalar​

Name of the extension field.

IMSProjectTemplate.usedIn ● IMSProjectConnection! non-null object​

Entities which use this template.

IMSProjectTemplate.usedIn.after ● String scalar​

Get only items after the cursor

IMSProjectTemplate.usedIn.before ● String scalar​

Get only items before the cursor

IMSProjectTemplate.usedIn.filter ● IMSProjectFilterInput input​

Filter for specific items in the connection

IMSProjectTemplate.usedIn.first ● Int scalar​

Get the first n items. Must not be used if before is specified

IMSProjectTemplate.usedIn.last ● Int scalar​

Get the last n items. Must not be used if after is specified

IMSProjectTemplate.usedIn.orderBy ● [IMSProjectOrder!] list input​

Order in which the items are sorted

IMSProjectTemplate.usedIn.skip ● Int scalar​

Skips n items. First or last MUST be specified, is otherwise ignored

Interfaces​

BaseNode interface​

Shared extensions to the node type.

BaseTemplate interface​

Base type for both Template and SubTemplate. Defines templated fields with specific types (defined using JSON schema). READ is always granted.

Named interface​

Entity with a name and a description.

NamedNode interface​

Node with a name and description

Node interface​

Base class of all nodes

SubTemplate interface​

BaseTemplate which is part of a Template. Defines templated fields with specific types (defined using JSON schema). Does not provide any composition features, as composition is handled by the Template it is part of.

Member of​

IMSProject object ● IMSTemplate object