IMSProjectTemplate
SubTemplate for IMSProject. Part of a IMSTemplate. Defines templated fields with specific types (defined using JSON schema).
type IMSProjectTemplate implements BaseNode, BaseTemplate, Named, NamedNode, Node, SubTemplate {
description: String!
hasPermission(
permission: AllPermissionEntry
): Boolean!
id: ID!
name: String!
partOf: IMSTemplate!
templateFieldSpecifications(
namePrefix: String
): [JSONField!]!
usedIn(
after: String
before: String
filter: IMSProjectFilterInput
first: Int
last: Int
orderBy: [IMSProjectOrder!]
skip: Int
): IMSProjectConnection!
}
Fields
IMSProjectTemplate.description ● String! non-null scalar
The description of this entity.
IMSProjectTemplate.hasPermission ● Boolean! non-null scalar
Checks if the current user has a specific permission on this Node
IMSProjectTemplate.hasPermission.permission●AllPermissionEntryenumThe permission to check for
IMSProjectTemplate.id ● ID! non-null scalar
The unique id of this node
IMSProjectTemplate.name ● String! non-null scalar
The name of this entity.
IMSProjectTemplate.partOf ● IMSTemplate! non-null object
The Template this SubTemplate is part of
IMSProjectTemplate.templateFieldSpecifications ● [JSONField!]! non-null object
All template field specifications, if a
namePrefixis provided, only those matching it
IMSProjectTemplate.templateFieldSpecifications.namePrefix●StringscalarName of the extension field.
IMSProjectTemplate.usedIn ● IMSProjectConnection! non-null object
Entities which use this template.
IMSProjectTemplate.usedIn.after●StringscalarGet only items after the cursor
IMSProjectTemplate.usedIn.before ● String scalar
Get only items before the cursor
IMSProjectTemplate.usedIn.filter ● IMSProjectFilterInput input
Filter for specific items in the connection
IMSProjectTemplate.usedIn.first ● Int scalar
Get the first n items. Must not be used if before is specified
IMSProjectTemplate.usedIn.last ● Int scalar
Get the last n items. Must not be used if after is specified
IMSProjectTemplate.usedIn.orderBy ● [IMSProjectOrder!] list input
Order in which the items are sorted
IMSProjectTemplate.usedIn.skip ● Int scalar
Skips n items. First or last MUST be specified, is otherwise ignored
Interfaces
BaseNode interface
Shared extensions to the node type.
BaseTemplate interface
Base type for both Template and SubTemplate. Defines templated fields with specific types (defined using JSON schema). READ is always granted.
Named interface
Entity with a name and a description.
NamedNode interface
Node with a name and description
Node interface
Base class of all nodes
SubTemplate interface
BaseTemplate which is part of a Template. Defines templated fields with specific types (defined using JSON schema). Does not provide any composition features, as composition is handled by the Template it is part of.
Member of
IMSProject object ● IMSTemplate object